Monday, September 17, 2018

It's Electric-Boogie Woogie

 The photo above shows the newly installed 1 inch line that we have installed for future power to the front gate area.
 The photo above shows where the 3 new conduits are diverging.The biggest one that just stops is a 2+1/2 inch conduit that will provide for 100 amp service to the north east corner where the proposed engine house will be placed

This photo above shows the termination point for the 1 inch line and the 1+1/2 inch conduit that will feed the new 120/240 outlets near the tender and ping pong coach.

Finally, this shot above shows the newly installed 1+1/2 inch line to power the welder and power tools needed to complete the tender and ping pong coach restorations.

George and I will meet our electrician Wednesday morning to install the rest of the 2+1/2 inch line and complete the "rack" for the 120/240 volt outlet installations at the "station" building corner that you see above.

No comments:

Post a Comment