we did, but know we don't!
As of this past Saturday, we have PROPER 120 and 240 volt service right where we are working.
So, we took advantage of this and Fred, George, Paul and I installed the first new piece into the Ping Pong Coach. To us it was HUGE!
To most people, they would look at a 3ft by 9 inch sheet of metal and go, hmmmm.
this part was fabricated by Fred and welded into the south west corner under the bathroom floor and will allow us to add the steel angles that were previously fabricated under what will be an installed toilet flange.
Next week! those angle braces.
Gary