Today is Sunday August 27, so it's time for an updated post.
Since I didn't have a working camera last week, I couldn't take photos and I guess I just plain forgot to post what went on.
Here we go.....
For the last two weeks, our President John Specce, has been working on site with our Electrician Steve Bauer to continue putting in our electrical system for the yard and Turntable.
This is the newly installed power head for the turntable. It was installed just below the cross arms which carry the wires to the collector arch.
This photo shows the Main power head assembly going to the Meter Pan which will supply the entire yard with electric. Just to the right of the head you can clearly see the rack which is holding the power conductors from the LIPA pole on Harbor Place.


During the past 2 weeks, Paul and I have been busy needle scaling paint off of the Ping Pong Coach stairs while George, Bernard and John were removing the panels under the windows and removing all of the insulation so we can finally weld up the  rust holes. Also removed were the seats and the heating vent covers. Also removed was the actual heating pipe. It had to be cut out.
At this time we only have to remove the panels under the car floor which will then allow us to break up ALL of the damaged concrete floor from the center beam to the north side windows. We will then weld on an angle bracket along the bottom of the windows and lay in corrugated metal onto which we will then pour lightweight concrete to complete the floor on that side of the car.
When dry, we will remove the seats, wall panels, heating vents and piping on the South side of the car just like the North in order to pour a new floor there as well. Our final plan is to re-install Marmoleum floor tiles to approximate the original flooring.

This is a shot of the paint on the step as I was in the midst of removal.
What is very interesting is that I found a very red glossy color paint under all of the other layers of paint  but right on top of the primer. Strange! I guess I will have to look into it.



As all of this was going on, John Petsche and Fred Rubin were busy getting the forklift running again. We will definitely need this as we will be receiving from the LIRR the M7 and DE/DM simulators that are being scrapped AND we will be receiving our 40 foot x-New Haven boxcar via truck. Our plans are to place the M7 where the Steam Engine is and place the DE where our Forklift is. We will move the crossing shanty west of where it Is and place the steam engine there. We will also move the tender trucks between the locomotive frame and the boiler  as well as move the tender frame so as to make room to place the boxcar between the Coach and the Fence line.

Also going on is that John Petsche has been steadily completing the static restoration of the yellow "dinky" in preparation for its move onto the turntable after the turntable is operating.

Now, For those of you who don't believe that we really work, here is a photo of me taken yesterday when I got home. Believe it or not, this is after a cursory cleanup before I took a shower!

No comments, please but feel free to laugh all you want!