It's now Sunday afternoon 4/25/10 and I have finally found the time to write down my impressions on Yesterdays (4-24-10) work session.
With plenty of hands on board, we were able to remove all of the remaining parts to be worked on from the trailers and moved around about 20 pallets of parts to get to them.
With the exception of the main driver bearing boxes, everything we removed has been cleaned, degreased and coated. They have also been wrapped, palletized and replaced into the trailers.
We also had a small crew working on the driver crankpins, bearing and journals as well as the pilot truck journals.
I took it upon myself to treat everyone to a nice lunch of BBQ burgers and dogs. I think they were getting sick of PIZZA.
For next weeks session the bearing boxes will be completed and that will leave us ONLY to clean out and coat both steam cylinders and both valve cylinders, the crosshead guides and the pedestal legs on the frame of #35.
With another crew like yesterday we can accomplish this task in about 4-5 hours.
This will then allow us to get back to working on the turntable.
During this coming week, a few of the volunteers who are retired will be going up to clean out and prepare the historic train station for our upcoming open house which will be on Saturday May 8th from 10-4pm.
We will also be dedicating our recently completed Worlds Fair Cab display which starts promptly at 2pm.
We are doing this dedication in honor of 3 of our volunteers who have passed away.
George Hunka, Pete "Fazoots" Taormina and James "Jamie" Carley.
This dedication meant more to me as I knew all 3 and Jamie was my brother in law. Many Carley family members attended the dedication and were grateful that we remembered him and our other 2 friends
If you are a faithful follower of my blogs, come on down and say hi. Unfortunately, I won't be able to attend as my nephew is making his communion, but stop by and tell everyone from OBRM that you are a blog follower!
Gary

Tuesday, April 20, 2010

Some NEW information

Folks,
just to let you know, we are on facebook and my photos are up at PHOTOBUCKET under THEWINEGUY35. Soon we will be on TWITTER  as well. I guarantee you that I WILL NOT be doing the twittering! I am enough of a twit and our FACEBOOK page will be maintained by one of our younger members. I'm too much of a dinosaur for FACEBOOK.
Gary

Sunday, April 18, 2010

Work, Work, Work!

 A dreary start to the work day.
Thankfully the coffee was hot.
With only four people at the worksite, we managed to move hundreds of parts around in order to remove the first set of pieces from the parts trailer. We worked on 1 set of drive rods, 1 set of reverser links and quite a few sets of valve gear rods and eccentrics as well as a host of smaller parts that needed attention. As I last mentioned, we need to clean all bearings of grease and old alemite as well as all journals associated with the valve gear parts and reciprocating parts for #35's drive train. With a few more hands over the next 3 weekends, we should be able to complete the task at hand   before the contractor, Steam Operations Corp. comes in for their inspection date in May.
Keep your fingers crossed for a great turnout next week!
Gary

Sunday, April 11, 2010

The beginning of (we hope) the end-of the tunnel!

Well, we started the restoration of #35.
Shouldn't I be happier??
Our crew started the restoration by working on the braking system on our forklift. We were still encountering a major issue with the brakes applying automatically while in reverse. Not a way to work, so we adjusted them. This meant a 3 hour marathon wheel and axle removal/replacement session.
After a short lunch, we set up a work tent and moved one of the 2 heavy duty shop work tables inside of it and the other was moved parallel to the parts trailer so we can set up a second tent over it.
This will give us plenty of dry work space and allow 2 people to use the tables simultaneously to get more parts competed.
We were given a list by our contractor, Steam Operations Corporation (S.O.C), a very prominent steam locomotive rebuilder and most of the list if not all was regarding the reciprocation assemblies.
Drive & pilot trucks, Valve gear assembly, rods and steam/valve cylinder interiors.
There are a lot of parts involved and since we are just a Saturdays only volunteer force, we need to move out many parts at a time.
These parts will need to have their journal faces, bearing faces and crankpin diameters checked against the PRR/LIRR blueprints for the G5s class of 10 wheeler that #35 belongs to in order to begin a plan to restore the parts.
We will be cleaning all of the area listed for us and then coating the pieces so the contractor can do his work.
This is phase 1.
After this phase has been completed, Scott Lindsey (S.O.C), will bring in his crew for a few days and measure/record all of the findings. Then he will go back to his offices and create a master plan with associated costs.
This plan will then be submitted for verification against the blueprints and work will begin to move the parts to his shop for the rebuilding during phase 2!
Pray for us to
finish on time.
Then we can go back to finishing our turntable!!!!!
Gary

Saturday, April 3, 2010

The dreary side of museum work

What a day it was!!

Sunny, dry and unseasonably warm.
This was a day that was a long time coming. Years in fact!!

Plenty of hands were on deck, which allowed us to perform MUCH needed maintenance on our truck and forklift. Even though some always said we were throwing good money after bad on these two pieces of equipment, they have always proven themselves when we needed them.

The forklift had MAJOR work done to change all of the fluids/filters, new battery cables and a horn was installed. Unfortunately, the parts store could not get us the radiator hoses and an air filter for it and we have not gotten the special wheel hub tool which would allow us to service the brakes.
These parts will be in this coming week and we will need to spend a few more hours performing the needed service.

As for our truck, all of the fluids/filters were changed out and the entire truck was lubed up as well. We also needed to lube up the door latches in order to open them up more easily. We only need to change out 2 more belts and the windshield wipers. Again, not available.
Both units are working better than they have in years and the truck also received a new paint job. Worlds Fair GREY.
The forklift will receive a new paint job next time.

These two units will be in heavy duty use over the next 6 weekends as we prepare to unload the 2-40 foot trailers of parts for #35.
Why? because we are starting the restoration of #35's frame & running gear!

Gary

Sunday, March 28, 2010

We are back!-3/27/10

1st work session of 2010.
It was cold but bearable due to the fact that we were preparing the grounds for  a new project. This is the start of the actual restoration of former LIRR steam locomotive #35.Yeah for us!!!
We have been given the green light as far as the money goes and over the next 5 weekends, we will be taking a certain amount of parts that were on a list, given to us by Scott Lindsey of Steam Operations Corp, out of out trailers and we will be cleaning and prepping them for inspection. These parts are from the drive train of #35. The drive rods and bearings will be inspected and their measurements will be compared to the blueprints to see how much work will be needed to restore them to "factory" conditions.
I am hoping that Scott gives us the ok to start needle scaling the frame itself.
We got busy moving our visitors center about 25 feet forward and north of its original position and them we were finally able to remove the clamps from the old turntable ties. These were them moved west and put up against the LIRR fence. We then put all of the scrap steel that we had into our dunp truck and moved both it and our forklift out of the site. All of the turntable walkways and the 2 steel "I" beams that were given to us by the LIST chapter NRHS years ago (for lifting #35's frame) were also moved away from this area. We can now move both of the parts trailers forward about 20 feet. This will allow us access to remove the parts and will eventually allow us to move the trailers off site when they are FINALLY empty.
We have not forgotten about the turntable and to that end have received on-site from Wit Craft Electric, the turntables electric motor, the resistor bank and the split ring electrical collector all restored beautifully by Bill Dumper. This man is a creative genius! He still has the actual control stand and will hopefully be finished by June.
Until next time
Gary

Saturday, December 5, 2009

OBRM Museum happenings

This weekend ,December 4+5 2009 is our Holiday Express show at the Museums Preview Center at 102 Audrey Ave in Oyster Bay from 12-4.
Santa is here today & tomorrow and we will have a horse drawn carriage ride through town on Sunday .
It will start at out museum and make a few stops along the way then return you to our museum where you can have some hot apple cider, cookies and the kids can have candy canes and have a photo taken with Santa himself! We have 2 operating o gauge train layouts for the kids to play with and for the smaller tots we have a wooden train set that they can get their hands on and play with.
You can enter our 50-50 raffle and buy chances for some great gift baskets and a  "Thomas" train set donated by Willis Hobbies of Mineola. Willis Hobbies has been a huge supporter of our Museum for many years and we congratulate them as they celebrate their 60th anniversary this year.
Our new neighbor, "A Healthy U" has donated mini fruit candies that are ALL NATURAL and made from 100% American Grown Fruit, Folks these are the real deal and are a healthy snack.